After completing the walls, I roughed in the interior plumbing using plumbing channels and then covered it all with 3/4 drain rock. The following Spring, I finished off some rammed earth walls for windows and a sliding door.
After completing the walls, I roughed in the interior plumbing using plumbing channels and then covered it all with 3/4 drain rock. The following Spring, I finished off some rammed earth walls for windows and a sliding door.